The work included in the Base Bid for this project includes the construction of a 611 sf Variable Frequency Drive (VFD) Room Addition to the original Donkey Creek Pump Station #1 building located approximately 13 miles east of Gillette, Wyoming. The work includes concrete footings, CMU walls, new roofing at the entire south half of the existing roof, additions to the electrical systems, additions to the mechanical systems, and other miscellaneous work.
Bid Alternate 1 consists of the cost to remove and reinstall the existing RTU-2 HVAC unit at the north wall of the existing building. The cost includes the grading and new concrete slab, removing and salvaging the existing wall vent at the new location, and reinstalling the salvaged wall vent at the old location.
Bid Alternate 2 consists of the cost to sandblast and remove the existing paint at the interior side of the west, north and east walls of Existing Pump Room. This alternate also includes the application of water repellent to the exterior sides of the west, north, and east walls of the Existing Pump Room.
Structural Dynamics provided design and bidding phase services. The project was advertised on April 10, 17, and 24. Bids were opened and read aloud on April 29, 2020 at 3:00 P.M. The following five bids were received:
Bidder |
Base Bid |
Alternate 1 |
Alternate 2 |
Total Bid |
Norton Construction, Inc. |
$514,000.00 |
$9,970.00 |
$18,265.00 |
$542,235.00 |
Powder River Construction, Inc. |
$415,000.00 |
$13,800.00 |
$20,000.00 |
$448,800.00 |
Van Ewing Construction, Inc. |
$508,652.00 |
$8,000.00 |
$11,550.00 |
$528,202.00 |
S&S Builders, LLC |
$686,595.00 |
$10,375.00 |
$8,275.00 |
$705,245.00 |
Hladky Construction, Inc. |
$506,801.33 |
$8,813.60 |
$7,475.00 |
$523,089.93 |
Engineer’s Estimate |
$558,517.00 |
Structural Dynamics reviewed Powder River Construction's (PRC) bid and had a phone conversation with their project manager and determined that a subcontractor bid for the HVAC equipment and work was left out of their bid. Despite this discrepancy, PRC intends to complete all the work in the contract for their bid amount. Structural Dynamics' bid recommendation letter is attached. |