Contract Description:
This contract will consist of trenching, boring and excavation required for the installation of conduit, junction boxes and transformer pads for underground power lines to be installed at various locations for the electric utility as well as other similar needs for other City departments and divisions.
Bid Opening:
Bids for this project were opened on June 10, 2020 at 10:00 A.M. at the office of the Purchasing Division, Central Warehouse, 800 North Burma Avenue, Gillette, Wyoming. Contract bid documents were received from three bidders. The bid evaluated costs are shown below:
CONTRACTOR
|
BID EVALUATED COST
|
DRM, Inc.
|
$74,140.00
|
MCM General Contractors, Inc.
|
$77,512.50
|
JW Services
|
$121,747.50
|
The evaluated total shown above is based on a formula set for the purpose of bid evaluation only. A copy of the bid tabulation is attached for your review. |