The City desires to construct a Softball/Baseball Complex on property owned by the City of Gillette between East Boxelder Road and Garner Lake Road on the east side of Gillette. The project has been designed through a separate contract to build eight (8) fields, and associated infrastructure. A project to install the water main, the sewer main, and to rough grade the property is currently under construction. A Construction Manager at Risk (CMAR) Request for Proposal (RFP) has been issued to obtain Pre-Construction Construction Manager services to develop a Guaranteed Maximum Price (GMP) to construct the fields, and remaining infrastructure for the facility. It is intended that a Construction Manager (CM) will be chosen by July 24, 2013, and the GMP will be finalized September 11, 2013.
This contract will involve the services of PCA Engineering, Inc. to assist the CM, if chosen, with input on costs, cost effective construction materials, constructability, value engineering, advanced project planning, scheduling, and sequencing issues throughout the pre-construction design phase. This work will include background research, meetings, review of cost management logs and potential cost saving measures, and coordination with sub-consultants, including landscaping, architectural, mechanical, plumbing, and electrical.
|