Burns & McDonnell Engineering Co. (B&McD) is the City's design engineer for this project. During the regular City Council meeting on May 21, 2012, the City of Gillette approved a Construction Program Management and Control Services contract with B&McD for a 40-month duration in the amount of $1,788,991.00. The May 2012 Professional Services Agreement did not include construction phase services for this particular pipeline construction contract. Rather, the May 2012 agreement provides program management and document control services for the entire construction phase for costs not directly associated with each individual construction contract. It was our intent at that time to award separate amendments to the May 2012 agreement to B&McD to coincide with the separate award of individual construction contracts during the 40-month construction phase period.
Contract #8 generally consists of the furnishing and installation of approximately 31,500 linear feet (6 miles) of 18-inch potable waterline, including all appurtenances, restraint, isolation valving, air vacuum valves, blow-off assemblies, connections to the existing system, 1,250 linear feet of 30-inch bored steel casing, cathodic protection systems, testing, pavement removal and replacement, and site restoration.
B&McD will provide services to perform all necessary bidding, construction administration, inspection, materials testing, and other construction phase services directly related to construction Contract #8 for this project.
|